<?xml version="1.0" encoding="utf-8" standalone="yes"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom" xmlns:content="http://purl.org/rss/1.0/modules/content/">
  <channel>
    <title>Dc-Distribution on FaultManagedPower.org</title>
    <link>https://faultmanagedpower.org/topics/dc-distribution/</link>
    <description>Recent content in Dc-Distribution on FaultManagedPower.org</description>
    <generator>Hugo -- 0.156.0</generator>
    <language>en-us</language>
    <lastBuildDate>Sun, 08 Mar 2026 00:00:00 +0000</lastBuildDate>
    <atom:link href="https://faultmanagedpower.org/topics/dc-distribution/index.xml" rel="self" type="application/rss+xml" />
    <item>
      <title>LinkedIn post by Alexis Bertholf discussing fault-managed power over twisted pair</title>
      <link>https://faultmanagedpower.org/pulse/linkedin-post-by-alexis-bertholf-discussing-fault-managed-power-over-twisted-pair/</link>
      <pubDate>Thu, 26 Feb 2026 00:00:00 +0000</pubDate>
      <guid>https://faultmanagedpower.org/pulse/linkedin-post-by-alexis-bertholf-discussing-fault-managed-power-over-twisted-pair/</guid>
      <description>Discussion of fault-managed power delivering up to 1 kW over single twisted pair using high voltage, low current, continuous fault detection, and instant shutoff.</description>
    </item>
    <item>
      <title>TierPoint: AI workloads driving high-density rack power &amp; DC delivery shifts</title>
      <link>https://faultmanagedpower.org/pulse/tierpoint-ai-workloads-driving-high-density-rack-power-dc-delivery-shifts/</link>
      <pubDate>Thu, 19 Feb 2026 00:00:00 +0000</pubDate>
      <guid>https://faultmanagedpower.org/pulse/tierpoint-ai-workloads-driving-high-density-rack-power-dc-delivery-shifts/</guid>
      <description>TierPoint blog on AI workload power density driving rack design changes, DC power delivery adoption, and cooling constraints in high-performance colocation.</description>
    </item>
    <item>
      <title>Cence Power launches Class 4 fault-managed DC power distribution in Canada</title>
      <link>https://faultmanagedpower.org/pulse/cence-power-launches-class-4-fault-managed-dc-power-distribution-in-canada/</link>
      <pubDate>Wed, 18 Feb 2026 00:00:00 +0000</pubDate>
      <guid>https://faultmanagedpower.org/pulse/cence-power-launches-class-4-fault-managed-dc-power-distribution-in-canada/</guid>
      <description>Markham-based Cence Power introduces Class 4 DC distribution for data centers and telecom, reducing copper requirements and enabling safer high-voltage DC delivery.</description>
    </item>
    <item>
      <title>AI &amp; Energy Storage: Why It Matters for Data Centres</title>
      <link>https://faultmanagedpower.org/pulse/ai-energy-storage-why-it-matters-for-data-centres/</link>
      <pubDate>Mon, 16 Feb 2026 00:00:00 +0000</pubDate>
      <guid>https://faultmanagedpower.org/pulse/ai-energy-storage-why-it-matters-for-data-centres/</guid>
      <description>Explores tiered energy storage deployment in data centers, from chip to grid, including FMP/Class 4 power distribution for AI workloads and UPS resilience.</description>
    </item>
    <item>
      <title>Southland Industries PE compares 6 MW data center AC vs. FMP infrastructure costs</title>
      <link>https://faultmanagedpower.org/pulse/southland-industries-pe-compares-6-mw-data-center-ac-vs.-fmp-infrastructure-costs/</link>
      <pubDate>Wed, 15 May 2024 00:00:00 +0000</pubDate>
      <guid>https://faultmanagedpower.org/pulse/southland-industries-pe-compares-6-mw-data-center-ac-vs.-fmp-infrastructure-costs/</guid>
      <description>Engineering analysis of 6 MW data center power infrastructure: traditional AC versus FMP with parts-and-labor costing showing multi-million dollar savings.</description>
    </item>
    <item>
      <title>415 VAC Power Distribution for Data Center Efficiency and Density</title>
      <link>https://faultmanagedpower.org/pulse/415-vac-power-distribution-for-data-center-efficiency-and-density/</link>
      <pubDate>Fri, 17 Jul 2020 00:00:00 +0000</pubDate>
      <guid>https://faultmanagedpower.org/pulse/415-vac-power-distribution-for-data-center-efficiency-and-density/</guid>
      <description>White paper on deploying 415V 3-phase AC power to rack level in North American data centers to reduce transformer losses, capital costs, and floor space.</description>
    </item>
  </channel>
</rss>
