All Pulse Updates (216 total)
2019-02-23
CPI White Paper: Selecting Rack-Mount PDUs and Power Strips for Data Centers
Rack-level PDU selection affects monitoring integration, redundancy design, and power delivery reliability for ICT equipment installations.
Data Center Frontier
2019-02-23
Chatsworth Products White Paper on Rack PDU Selection Considerations
Addresses PDU selection criteria including phase, redundancy, and rack-level monitoring integration—key tradeoffs for reliable power delivery at the rack.
Data Center Frontier
2017-08-23
Guide to Intelligent Rack Power Distribution for Data Centers
Rack PDU selection constraints (phases, voltage, amps, branch circuits, outlets, socket/plug types, rack units) directly affect power distribution design and deployment.
Data Center Frontier
2016-12-29
FORTRUST Adopts Diesel Rotary UPS for Backup Power at Denver Data Center
DRUPS eliminates battery maintenance burden and space constraints while preserving ride-through; COO spent 2 years evaluating to maintain 14+ year uptime record.
Data Center Frontier
2015-02-20
NEC Article 502: LFMC bonding requirements in Class II hazardous locations
NEC 502.30(B) mandates wire-type bonding jumpers for LFMC in Class II locations, affecting conduit selection and labor in hazardous industrial edge sites.
EC&M
2014-08-18
NEC Article 300: General Requirements for Branch Circuit & Feeder Wiring Methods
2014 NEC expanded underground conductor rules and allowed RTRC-XW for physical damage locations, directly affecting feeder/service install methods and costs.
EC&M
2013-03-18
Testing and Troubleshooting Power Distribution Wiring Systems
Training gaps in systematic troubleshooting and NFPA 70E compliance drive facility downtime costs; maintenance approach affects repair-vs-replace economics.
EC&M
2011-08-19
NEC Chapter 5 wiring methods for hazardous locations (Class I, II, III)
NEC Chapter 5 (Art. 501, 502) mandates specialized wiring methods/materials in hazardous locations, directly impacting install labor, material selection, and AHJ approval.
EC&M
2011-08-19
NEC 2011 Article 300 Wiring Methods: Protection and Fitting Changes
2011 NEC tightened physical damage protection for all conductors, added 1.5-in clearance rule for boxes under metal roof decks, mandated identified fittings for 4 AWG+.
EC&M
2004-03-01
NEC Art. 300 Wiring Methods: Power Quality Case Study at Engine Plant
NEC Art. 300 wiring continuity requirements prevent inductive heating and reduce ground fault impedance, directly impacting system performance beyond safety.
EC&M
2000-12-01
Wiring Methods for Industrial Machinery: NEC vs NFPA 79 Requirements
NFPA 79 diverges from NEC on industrial machinery wiring, affecting contractor compliance approach and color-coding practices in manufacturing settings.
EC&M
1995-11-30
Power distribution equipment overview: switchgear, transformers, and voltage segmentation
Educational overview of distribution equipment categories, but lacks constraints, failure modes, or deployment detail for practitioner decisions.
EC&M
1995-11-30
Power distribution equipment overview: MV/LV switchgear, substations, and segmentation
Generic equipment taxonomy without constraints, tradeoffs, or deployment context relevant to modern FMP decision-making.
EC&M
1995-11-30
Power distribution equipment overview: medium and low voltage architecture
Educational overview of distribution equipment taxonomy, but lacks constraints, failure modes, or deployment specifics relevant to current FMP practice.
EC&M
1995-11-30
EC&M overview of medium and low voltage power distribution equipment
Educational primer on power distribution architecture but lacks actionable constraints, failure modes, or modern deployment details.
EC&M
0001-01-01
Pulse Archive