What it is

A social media post (day 34 of 100) flags electrical panels and wiring as a potential home inspection concern, noting increased power needs from EVs and heat pumps versus 30 years ago. The excerpt contains only the post header/navigation elements with minimal content.

Why it matters

Page excerpt is mostly Instagram UI boilerplate with no concrete panel sizing, NEC references, load calculations, or upgrade costs. Cannot extract actionable constraint information for GC/MEP or electrical contractor decision-making.

Open questions

  • What panel amperage or wiring gauge requirements are recommended for combined EV + heat pump loads?
  • What inspection failure modes or upgrade costs are typical in existing homes?