<?xml version="1.0" encoding="utf-8" standalone="yes"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom" xmlns:content="http://purl.org/rss/1.0/modules/content/">
  <channel>
    <title>Guides on FaultManagedPower.org</title>
    <link>https://faultmanagedpower.org/guides/</link>
    <description>Recent content in Guides on FaultManagedPower.org</description>
    <generator>Hugo -- 0.156.0</generator>
    <language>en-us</language>
    <atom:link href="https://faultmanagedpower.org/guides/index.xml" rel="self" type="application/rss+xml" />
    <item>
      <title>What Is Fault Managed Power (Digital Electricity)?</title>
      <link>https://faultmanagedpower.org/guides/what-is-fmp/</link>
      <pubDate>Mon, 01 Jan 0001 00:00:00 +0000</pubDate>
      <guid>https://faultmanagedpower.org/guides/what-is-fmp/</guid>
      <description>A clear, grounded explanation of how FMP works, what problem it solves, how it differs from PoE and conventional wiring, and where it fits — for practitioners and informed newcomers.</description>
    </item>
    <item>
      <title>NEC Class 4 / Article 726: What Electricians and AHJs Need to Know</title>
      <link>https://faultmanagedpower.org/guides/nec-class-4-article-726/</link>
      <pubDate>Mon, 01 Jan 0001 00:00:00 +0000</pubDate>
      <guid>https://faultmanagedpower.org/guides/nec-class-4-article-726/</guid>
      <description>NEC Class 4 (Article 726 in the 2023 NEC; Article 722 in the 2026 NEC) is the code pathway for fault managed power systems. It is separate from Class 2 and Class 3 — different safety model, different wiring rules, same installation methods.</description>
    </item>
    <item>
      <title>Where FMP Fits: Verticals, Use Cases, and Fit Conditions</title>
      <link>https://faultmanagedpower.org/guides/where-fmp-fits/</link>
      <pubDate>Mon, 01 Jan 0001 00:00:00 +0000</pubDate>
      <guid>https://faultmanagedpower.org/guides/where-fmp-fits/</guid>
      <description>FMP is not a universal replacement for conventional electrical distribution. It is strongest in constrained retrofits, long distributed runs, and projects where the conventional path is blocked by cost or schedule. Here&amp;#39;s how to identify good candidates quickly.</description>
    </item>
    <item>
      <title>How FMP Is Installed: A Contractor&#39;s Overview</title>
      <link>https://faultmanagedpower.org/guides/how-fmp-is-installed/</link>
      <pubDate>Mon, 01 Jan 0001 00:00:00 +0000</pubDate>
      <guid>https://faultmanagedpower.org/guides/how-fmp-is-installed/</guid>
      <description>FMP installations follow Class 2 wiring methods — no conduit required — but the transmitter and receiver introduce commissioning steps and an AHJ documentation requirement that differ from conventional electrical work. Here&amp;#39;s what to expect from rough-in through inspection.</description>
    </item>
    <item>
      <title>Scoping and Estimating an FMP Project</title>
      <link>https://faultmanagedpower.org/guides/scoping-and-estimating/</link>
      <pubDate>Mon, 01 Jan 0001 00:00:00 +0000</pubDate>
      <guid>https://faultmanagedpower.org/guides/scoping-and-estimating/</guid>
      <description>How to qualify an FMP project, build a reliable ROM estimate, and identify the cost drivers that determine whether FMP wins against conventional AC. Covers the seven-step ROM workflow, pre-bid data requirements, and AHJ timeline planning.</description>
    </item>
  </channel>
</rss>
